Mar 12, 2007.
Today, ESA electron High Voltages were checked out on probes A, B, D and E. Each was ramped up successfully to full voltage and all four performed beautifully. Probe C ESA was not ramped up because of the ongoing set up issue with the ESA/SST controller. We plan to get back to that probe tomorrow.